Skip to content
Home » Operational Procedures » Network Rules and Procedures

Network Rules and Procedures

  • by

Network Rules

 

General

OTGE 200 Walking in the Danger Zone 20190404

OTGE 202 Handsignals 20190404

OTGE 204 Network Communication 20190404

OTGE 206 Reporting and Responding to a Condition Affecting the Network CAN 20190404

OTGE 208 Responding to a Major Incident 20190404

OTGE 212 Network information publications 20190404

OTGE 216 Level Crossings 20190404

OTGE 218 Type F Level Crossing Management 20190404

OTGE 230 Communications equipment 20190404

OTGE 232 Responsibilities of Train Crews and track vehicle crews 20190404

OTGE 236 Responsibilities of Train Controllers 20190404

OTGE Status Sheet 11 Issue 1 Rev 0 20190404

 

Work on track

OTWT 300 Planning Work in the Rail Corridor 20190404

OTWT 302 Local Possession Authority 20190404

 

Train Working

OTTR 400 Protecting Trains 20190404

OTTR 402 Inspecting Trains 20190404

OTTR 404 Using Brakes 20190404

OTTR 406 Using Train Lights 20190404

OTTR 408 Using Train Whistles 20190404

OTTR 410 Defective Equipment 20190404

OTTR 412 Defective Running Gear 20190404

OTTR 414 Defective Vehicles 20190404

OTTR 416 Disabled Trains 20190404

OTTR 418 Yard Limits 20190404

OTTR 420 Shunting and Marshalling 20190404

OTTR 422 Shunting at Intermediate Sidings 20190404

OTTR 424 Propelling Trains 20190404

OTTR 426 Overdue Trains 20190404

OTTR Status Sheet 8 Issue 1 Rev 1-1 20190404

 

Systems of Safeworking

OTSY Status Sheet 11 20190404

OTSY 506 Staff and Ticket System 20190404

OTSY 514 Special Proceed Authority 20190404

OTSY 518 Suspending a System of Safeworking 20190404

 

Signals and Signs

OTSG 600 Running Signals 20190404

OTSG 602 Shunting Signals 20190404

OTSG 604 Indicators and Signs 20190404

OTSG 606 Responding to Signals and Signs 20190404

OTSG 608 Passing Signals at STOP 20190404

OTSG 610 Passing Indicators at STOP 20190404

OTSG 612 Overrun of Limit of Authority 20190404

OTSG 614 Blocking Facilities 20190404

OTSG 616 Precautions during Signal Testing 20190404

OTSG Status Sheet 11 20190404

 

Network Procedures

OTPR 700 Using a Local Possession Authority 20190404

OTPR 701 Using a Track Occupancy Authority 20190404

OTPR 703 Working Using Controlled Signal Blocking 20190404

OTPR 704 Using Infrastructure Booking Authorities 20190404

OTPR 707 Clipping points 20190404

OTPR 709 Using Railway Track Signals 20190404

OTPR 710 Piloting Trains and Track Vehicles 20190404

OTPR 711 Lookouts 20190404

OTPR 712 Protecting Work from Rail Traffic on Adjacent Lines 20190404

OTPR 713 Placing Temporary Speed Signs 20190404

OTPR 719 Operating Groundframes 20190404

OTPR 720 Protecting Trains 20190404

OTPR 721 Spoken and Written Communication 20190404

OTPR 731 Using Train Staffs 20190404

OTPR 740 Responding to Faulty Points 20190404

OTPR 745 Using Non-Interlocked Points 20190404

OTPR 746 Authorising Rail Traffic to Pass an Absolute Signal at STOP 20190404

 

Network Forms

 

Train Operating Conditions Manual